We are proud to announce the commissioning of NetOn Power’s first industrial on-site self-consumption plant. It is a 2 MW power plant for a plastic products manufacturer in Castilla-León, which will allow the client to cover more than 20% of their electricity demand without the need for any investment, through a 15-year PPA contract. The plant will produce 4,215 MWh of energy per year, equivalent to the consumption of 1,200 households, as well as a reduction of over 1,000 tons of CO2 annually, equivalent to removing 370 combustion vehicles from the road.
This plant adds to the 4 rooftop installations previously completed by NetOn for industrial clients and to the more than 50 MW of projects that our company is processing and building across Spain.
Link -> https://www.linkedin.com//alberto-martin.
Alberto Martín, CEO of NetOn Power, took part in the consumers panel at the 11th…
The project at Acideka's chemical plant in Lantarón (Álava), for which NetOn Power delivered the…
Acideka has inaugurated a pioneering project in Lantarón (Álava) that eliminates fossil fuels from its…
NetOn Power strengthens its role as a strategic partner for industrial decarbonisation through three onsite…
Self-consumption calls for extending distances, simplification and agility to drive its development
El Economista- In the following interview, the CEO of NetOn Power talks about the main…